• Perspectives Gütersloh

    Over the past decade, many gaps in building blocks have been closed in the city of Gütersloh. Various areas have been upgraded or restructured. With the integrated action plan, not only the urban design of the city will be further sharpened. With the participation of diverse actors, new prospects for the long-term development of the city are presented.

    Strategic decisions are prepared to make the city centre adaptable for changing spatial requirements in the future. The integrated action plan defines key objectives for development. Conceptual and design requirements are defined for e.g. functional mix, open space planning, or traffic issues. These recommendations are implemented and spatially located in a strategic master plan. On this basis, future developments and project proposals can be tested and evaluated and individual measures can be derived.

    completed
    2013
    Berliner Straße 70
    33330 Gütersloh
    Germany
  • Perspektivplan. Spatial Vision Freiburg

    Freiburg is a growing city where more and more people want to live. How can the city continue to be developed in a sustainable way? The Perspectivplan elaborates spatial development options for the City of Freiburg in the next 10 to 15 years. In the course of designing, built-up areas and open spaces are conceived and developed together. Based on a differentiated (GIS)-structure analysis, so far undetected potentials are made visible, development strategies are pointed out and by means of scenarios a future spatial image with a complementary structure plan is generated. The project has been developed in a cooperative process with stakeholders, the municipality, politics and the public.

    www.perspektivplan-freiburg.de

    completed
    2017
    Berliner Allee 1
    79114 Freiburg im Breisgau
    Germany
  • TXL Restart. Integral Systems

    The airport Berlin Tegel is going to be closed down. TXL will be developed as a high-quality research, industry and business park with the profile of 'urban technologies'. A strategic master plan builds the foundation for a flexible - and therefore, robust - planning process. Developmental guidelines and a profound system of rules create a structural, programmatic and creative quality of strategic important subareas.

    Simultaneously, more flexible developmental options are being allocated for other areas. ‚Quarters' profiles' emphasize existing potentials of subareas and strengthen the specific identity. An integrated concept for energy and water supports sustainable development: biomass, geothermal energy, wind energy and photovoltaics provide regionally generated energy. Gray and rainwater is being collected, refined and reused regionally. An urban aerial railway connects the site with the station and the tram. Here, the aerial railway is not only an efficient, sustainable means of transport but also represents sustainable mobility in terms of the site's profile.

    completed
    2012
    Saatwinkler Damm 62
    13627 Berlin Tegel
    Germany
  • Urbanizing the Periphery. Munich

    The study "periphery | landscape" identifies potentials and gives strategic advice for the long-term spatial development of the north-eastern periphery of Munich. The team was asked to work out a strategy for the development of an area of about 350 ha and to specify their findings for a sample size of around 150 ha.

    The approach is based on the following steps: The potentials of the area are recognized in a profound analysis and brought together in a synthesis map (A). Challenges concerning sustainable development in the periphery were discussed. They led the team to five strategies (B). These strategies provide a framework for long-term spatial development. They were developed in a close interplay with the design of a spatial vision for the North-East of Munich (C). The spatial vision shows ideas for future open spaces and new developments. The team invented a set of typologies of periphery settlement. The typologies focus on specific combinations of settlement and open space (D). A design for the sample site (E) is differentiated with stories, best-practice examples and development options in order to illustrate the everyday life of future inhabitants.

    completed
    2011
    Marienplatz 8
    80331 munich
    Germany