ul class="overview_list " id="projectList">
  • Vocational College of Machinery and Irrigation - VCMI (Vietnam), Dong Nai

    The design of the VCMI campus is based on sustainable principles in order to handle climate and urban challenges the area is exposed to. The masterplan aims for a clear functional zoning which allows future growth. The area reserved for sports can provide a diverse offer, as an educational complement for the students, but also space, passive to be rented, so the school can reinforce economical sustainability. The proposed area dedicated to teaching and training will allow VCMI to multiply its current offer. The Campus is organized around a cooling pond which is the centre of the water treatment concept: Collected rain water can be extracted for the use of grey water in the buildings. Complementing the new expansion is also forecast a Centre of Excellence for Green TVET, an institution that is inscribed in the scope of the Vietnamese-German Financial Cooperation. The junction of these two institutions will trigger synergy effects, unlocking the campus true potential, towards the aim of establishing themselves as one of the forefront regional institutions, but also contribute needed tools, to a resilient climate change in Vietnam.

    in progress
    2015
  • Rinia Complex, Fier

    The Rinia Complex is located in a former youth park in the center of Fier, on a plot that is open to 3 sides, facing different contexts. Our design for the mixed-use complex addresses these contexts, which represent the different and differing needs of the area. The building seeks to express the ambitions of the City of Fier, that is: to create a new image, one that is fitting for a city that is dynamic and continually growing, and to add important functions to the city like a public 25m pool and a cinema.

    Rinia Complex is a truly multifunctional building, with a program that also includes a 5-star hotel, 2 floors of parking space, residential units, a bank, a shopping center, a restaurant, and a casino. All public functions of the complex are accessible directly from the street via external staircases and are embedded into their urban surroundings. The building has been designed to be used in different ways at different moments throughout the day, offering both public/open access and private/restricted access areas. The intricate program has been fitted into a single volume, a uniquely shaped building that is internally 'fragmented' in order to give an answer to the different needs and the diversity of the context, but which also retains its flexibility as an urban 'shelf' that can take on a variety of functions.

    under construction
    2018
  • New Neighbourhood Hilligenwöhren, Hannover

    The new residential neighbourhood Hilligenwöhren is located on the threshold of a compact city to open landscape in Bothfeld. A composition of three- to four-storey buildings generates two courtyards with different spatial qualities. The norther green courtyards are the new neighbourhood's intimate centre, whereas the southern courtyard opens up to the street and hence to the neighbourhood.

    The buildings are connected via access balconies which activate the courtyards and are the basis for a vivid community. The central community room for all residents connects the two green spaces. It is the neighbourhood's living room. By opening and widening spaces, informal meeting points and social contact surfaces are offered. The building structure enables a flexible arrangement of various residential typologies und therefore a social mixture.

    A solid structure for the development of a long-lasting neighbourhood is offered. Furthermore, natural building materials ensure comfortable and healthy living environments.

    completed
    2016
  • Wolkenbügel Europacity Berlin, Berlin

    "... In the front the Baltic Sea, in the back the Friedrichstraße ..." In the EuroCity Berlin one can come close to this ideal. The design combines an urban block typology with a distinctively shaped bar - " the Wolkenbügel". Its shape is characterized by a large void. This wide passage connects the block via the neighbourhood square with the waterfront and at the same time the waterfront with the city.

    The void forms a partially covered urban stage for public uses such as weekly market, game or sport and thus a lively place along the promenade. The block is orientated to a central courtyard, which is connected to the neighbourhood square. The block is divided into ten different houses whose building height of seven floors decreases stepwise to five. All roofs are used as terraces. According to the different housing typologies and sizes, the widths of the houses vary as well. The houses are also distinguished in terms of facade rhythm and materiality.

    Idea
    2013
  • Bar Center Fier, Fier

    Building on existing structures.

    The plot of Bar Center in Fier (Albania), located next to our projects Rinia Complex and Building Block on a central urban intersection and adjacent to an inner-city park, was occupied by an existing building from the late 1990s. This building – the plinth of an unfinished high-rise, which stood at three storeys high – was unassuming and unfitting for this prominent location; therefore, the owners approached us to extend the building and upgrade the existing floors. So we used the volume of the existing building as a starting point for the design.

    The addition activates the upper floors and makes them directly accessible from the new main square of Fier, to which the building now prominently orientates. The result is a stepped five-storey volume enclosed in a geometrical, rasterized façade. This geometrical façade, in turn, is partially clad in semi-transparent golden shading sheets, which function as a screen against the sunlight. Additionally, they bring more unity to the building's appearance. The volume, whose two newly added floors contain a publicly accessible rooftop bar with views over Fier, offers an urban topography that serves the city as a whole.

    completed
  • Student City 2, Tirana

    Our reconstruction concept of Tirana's "Student City 2" aims to show the great potential for particularly thermal energy savings in construction, modern student housing and is showcasing a well performing example how public and private sector can interact. As the buildings suffers from massive deterioration on the inside, main focus of the energy concept lays on a replacement of all basic infrastructure, including a adequate ventilation and heating systems as well as new windows as its centrepiece to remedy humidity. Different subdivisions of student rooms with joined shared bathrooms and modifications in use of common rooms allows spacious privacy and reacts on students needs. Applying a complementary colored orientation and material system for each dormitory allows visual indication of buildings, floors and rooms and provides "Student City 2" with a unique identity. As the roofs of the buildings offer common space, they can be used according to public or economic visions of its users and leverage "Student City 2" to be Albania's pilot energy efficiency project.

    under construction
  • Kronsberg South A.2, Hannover

    The city block is structured by two cuts towards the public street. In this way, a community courtyard with neighboring pathways is created. The perimeter block development consists of six residential units and twelve townhouses on the east side. The street-facing brick facades are representative and respond to the importance of the entrance to the quarter. The spacious inner courtyard is zoned into a communal green center, surrounding paths and the private gardens lining the first floor apartments. All building entrances are barrier-free and all apartments are planned to be barrier-free. Each apartment has an outdoor sitting area and a small storage room. The underground parking garage is located in an L-shape under the northern block and is accessible from all staircases of the apartment buildings. There are also 145 bicycle parking spaces, some of which are equipped with charging stations.

    Idea
    2020
  • Water town Limmer, Hannover

    The program of the new quarter entrance describes a modern mixed-used block in which different functions come together and are arranged compactly to each other. The entrances to the main functions are oriented towards the public spaces and emphasise the priority square and corner situations in the urban context. The 7-storey residential tower houses 60 micro apartments with a café on the ground floor along the entire facade. The eastern block houses is the assisted living, the western block is the care facility, including the supermarket with parking decks and a southern and northern row of shops. All ground floor facades with public uses open up to the public space with generously sized windows. The design envisages a solid construction method in reinforced concrete and brickwork, which optimally depicts the various building parts, functions and room sizes according to their requirements.

    Idea
    2019
  • Family Villa, Hannover

    A listed villa of the 1850ties was converted into two family apartments. The large garden is used collectively. The 1st and 2nd floors were redesigned in relation to the needs of a couple with five children. Spaces „suitable for everyday use" are created and at the same time, the special character of the historic building with its ornamental elements and valuable wooden floors is strengthened.

    To reestablish the former spaciousness a multitude of fixtures and walls were demolished. The roof was reconstructed according to current energetic standards. The first floor serves as an entrance area with a large hall leading to the kitchen and the balcony. The master bedroom and one kid's room are orientated to the garden. The former ballroom as the heart of the building is used as a dining and living room. The space has an impressive size (55m2, 6m high) and is decorated with an ornamental ceiling that was preserved and - where necessary - restored. A gallery is installed into the ballroom as a slender glass-steel-structure: The stairs are suspended from the gallery to keep the parquetry untouched. The second floor is reserved „for kids only" and features four rooms, a play hall, and a bathroom. The staircase between the two floors is enhanced in its spaciousness by opening up a part of the ceiling. All design and constructive measurements were undertaken in detailed consultation with the institution for historic preservation.

    completed
    2012
  • House 1, Tirana

    House 1 is the first built project of the masterplan 'mirror twins'. On top of a shared commercial ground floor a green link connects the site with the close-by park. The two seperate buildings connected by the common plinth are generating an enormous amount of requested square meters. Rather massive volumes are perforated by a series of programmatic voids that connect to a common circulation space, an inner void. The much needed public space is integrated into the building by creating a second entry level and reinterpreting the circulation space. The engraving appearance
    of House 1 refers to the typical salient facades of Tirana. Multiple tilted strips create a rich play of light and shadow.

    completed
    2009
  • Meyer Forum, Osnabrück

    At the Hettlicher Masch, the new heart of the Meyer&Meyer company site is to be built. The office building is designed to be open, inviting and present as a "forum". The design is naturally integrated into the height development of the surroundings, forms a striking and inviting address to the street, but is also present and visible to the highway due to its three-storey structure.

    The rooms of the office building are organised around a two-storey gallery room and offer flexible work and learning rooms as well as a large variety of programmes with a café, showroom and fitness area. The ground floor in particular is characterised by its floor plan flexibility, as the atrium can be extended for company parties or large congresses. In addition, spacious terraces and loggias form encounter zones and recreation areas. A photovoltaic system, extensive roof greening and an intelligent self-sufficiency concept make this design in wood-reinforced concrete hybrid-construction fit for the future. Thus this design is also a prototype of new working worlds, which are characterised by atmosphere, diverse meeting spaces and flexibility of use.

     

    Idea
    2016
  • Orange Headquarters Mali, Bamako

    Bamako is in a phase of rapid urban development, with the population growing expansively; telecommunications are an integral part of this growth and are a marker for upward social mobility. The height, visibility, and clean volume of the new Orange Mali Headquarters express this situation, thus creating a landmark for the new, mobile urban class.

    At the same time, the building sets the bar for offices and urban planning in Bamako, by creating a zero-energy building that incorporates greenery and improves the working environment of the Orange employees. The new Orange HQ is surrounded by a public garden, a layout that makes the office building more accessible and simultaneously creates a social space for gatherings and events. The green spaces continue into the interior of the new office building as a sequence of open terraces. By using 'stacked' office floors, and by interspacing these with high-quality open spaces, employees feel more connected and floorplans can be optimized.

    The iconic, geometrical 'zig-zag' exterior is the result of a smart and site-specific design, avoiding direct sunlight on the facade.

    in progress
    2019
  • Green Wave. Glitnir Bank Hq, Reykjavik

    The design concept 'Green Wave' generates a holistic image and a characteristic coastal skyline for the site of Kirkjusandur in Reykjavik, Iceland. Two design principles characterize the appearance of all buildings: The dynamic shape of the wave as an aesthetic concept and the integration of green spaces as vital elements of functional and atmospheric quality. The new headquarters of Glitnir Bank, a nine-storey building addressing the prominent highway Sæbraut, will be the key figure for the future development.

    The elevated entrance plaza is secluded from the public flow on ground level and sheltered from heavy winds coming from the shore. Open working spaces can be organised and subdivided flexibly. Winter gardens on each floor increase internal lighting, provide space for informal communication and create a comfortable atmosphere and climate. A decentralized ventilation system and a heating system based on geothermal energy are implemented, which are economical in maintenance, space-saving and highly energy efficient. The façade consists of tilted glass elements creating a "deep skin" that reflects natural and artificial light in different angles.

    Idea
    2006/07
  • Primary and Comprehensive School Helios, Köln

    A new primary and comprehensive school (IUS) is planned for the former site of the Helios AG in Cologne Ehrenfeld. The school concept is based on the idea of a "university school", which spatially implements the educational objectives of inclusiveness: The school comprises the grades 1 to 13 and operates closely with the teacher training of the University of Cologne. This is architecturally reflected in an open learning environment for all grades. As part of a new high-quality and dense city block, the school should be an integral part and actor of the district: The school premises may be used publicly and the school offers a range of activities to the neighborhood.
    The school is designed as a compact structure, which is confidently positioned due to its clear-cut cubic form and at the same time contextualized by its orientation to axes and edges of the surroundings. It creates a clear address to the Vogelsanger Straße by a glass-enclosed foyer and a funnel-shaped, covered entrance situation. The inviting foyer and the localization of semi-public functions on the ground floor – such as the auditorium and educational center, the canteen, workshop and studio spaces – creates the desired integration of the school into the district and allows for important synergies of different usages.
    The common center - "the heart of the school" - spans over two floors and offers spacious stairs for meeting and seating: A great place for communication and leisure for all functional areas of the whole school.

    Excerpt from the jury report: "The jury praised in particular the optimal implementation of the educational objectives, which corresponds in a particular way to the intentions of the users. The learning environments are well designed and can be effectively used. Primary education is accessible as a separate unit on the first floor over short distances. The secondary education units I and II are localized on one level and are equipped with a spacious central communication zone, which provides space for a diverse range of activities. ..."

    Idea
    2015
  • Expo Park Hannover, Hannover

    The former area of the World Exposition 2000 is being transformed into the EXPO PARK HANNOVER: a high-class business and technology park with excellent infrastructure within walking distance to the world's biggest fairground. About 85% of the area is already being used by businesses, service providers, institutions for higher education and event locations. For the remaining plots, a development study was commissioned in order to visualize possible designs and volumetric developments.

    Special attention was paid to a wide range of programmatic options. The allotment provides plots between 2.000m2 and 20.000m2 and floor areas between 4.000m2 and up to 30.000m2. Different building types were developed and visualized in order to serve different needs concerning address-making, accessibility or internal organization. Exemplary designs are the OfficeTower, the ShowSPACE, the OfficeCUBES and the Start-upLAB.

    completed
    2006